This modern villa, currently under construction, is set on an 828 m2 plot, just 1.5 km from the stunning Benissa coastline and 3 km from Calpe's vibrant town center. Completion is scheduled for June 2025 (subject to change).
The villa spans two levels. The ground floor includes a 2-car garage with interior access, a bedroom with en suite, dressing room, laundry, toilet, and a relaxing spa area. An interior staircase leads to the upper floor, featuring an entrance hall, a fully equipped open-plan kitchen, and a spacious living-dining area with direct access to the terrace and pool. The sleeping quarters consist of three bedrooms, with the master boasting an en suite and the other two sharing a bathroom. All bedrooms open directly to the pool terrace via sliding doors.
The kitchen is outfitted with top-quality appliances, including an oven, microwave, plate warmer, fridge-freezer, dishwasher, and an extractor hood. The laundry room is equipped with a sink, washing machine, dryer, and a 250-litre heat pump boiler. The villa offers ducted air conditioning with independent thermostats and underfloor heating powered by an energy-efficient heat pump.
Exterior features include aluminium joinery, thermal and acoustic insulation, motorised shutters, and low-emissivity glazing for optimal insulation. The bathrooms include thermostatic showers with rain effect. The villa also boasts a pre-installed alarm system, halogen lighting, a photovoltaic system, a heated pool with automatic cover. The low-maintenance garden includes aerothermal heating with a solar panel for hot water.
Security is ensured with pedestrian and vehicle gates, and the garage access is paved with non-slip cobblestones. The spa area is equipped with RGB lighting, pre-installation for a jacuzzi, a bar, TV, and space for a pool table.
Contact Hamiltons of London today to schedule your private viewing.
Type:Villa
Bedrooms:4
Town:Calpe
Bathrooms:3
Area:Gran Sol
Toilets:1
Living rooms:1
Views:-
Dining rooms:1
Plot size:828 m2
Kitchen:Open
Constructed area:377 m2
Year of construction:2025
Energy Consumption rating: In process